Report of the Committee on Roads and Transport on the Contract Agreement between the Government of the Republic of Ghana (Represented by the Ministry of Roads) and Highways through the Department of Urban Roads and Rango-Dizmar JV) (A Joint Venture between Rango Construction Company Limited and Talleres Dizmar s.L.) for an amount of One Hundred and Forty Million Euros (€140,000,000.00) for the Design and Construction of Phase 1 of the Suame Interchange and Ancillary Works Project at Kumasi, Republic of Ghana, 2022

By: Material type: TextLanguage: English Publication details: Parliment of Ghana Accra 2022Description: 10p.: tabsSubject(s): DDC classification:
  • CR/G&RCTO/20
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Cover image Item type Current library Home library Collection Shelving location Call number Materials specified Vol info URL Copy number Status Notes Date due Barcode Item holds Item hold queue priority Course reserves
Committee Reports Main Library Open Shelves CR/G&RCTO/20 3043 (Browse shelf(Opens below)) 1 Available

There are no comments on this title.

to post a comment.
©2026  Parliament of Ghana Library - All rights reserved