Report of the select Committee on Mines and Energy on the project for the Interconnection of Ghana Gas Transmission system with the West African Gas Pipeline system to enable the Reverse flow of Gas from Aboadze to Tema .
Material type:
TextLanguage: English Description: 5pSubject(s): DDC classification: - CR/WAGP/15
| Cover image | Item type | Current library | Home library | Collection | Shelving location | Call number | Materials specified | Vol info | URL | Copy number | Status | Notes | Date due | Barcode | Item holds | Item hold queue priority | Course reserves | |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Committee Reports
|
Main Library Open Shelves | CR/WAGP/15 3669 C1 - CR/WAGP/15 3670 C2 (Browse shelf(Opens below)) | 1 | Available |
Browsing Main Library shelves,Shelving location: Open Shelves Close shelf browser (Hides shelf browser)
There are no comments on this title.
Log in to your account to post a comment.